COINOTAG recommends • Exchange signup |
💹 Trade with pro tools |
Fast execution, robust charts, clean risk controls. |
👉 Open account → |
COINOTAG recommends • Exchange signup |
🚀 Smooth orders, clear control |
Advanced order types and market depth in one view. |
👉 Create account → |
COINOTAG recommends • Exchange signup |
📈 Clarity in volatile markets |
Plan entries & exits, manage positions with discipline. |
👉 Sign up → |
COINOTAG recommends • Exchange signup |
⚡ Speed, depth, reliability |
Execute confidently when timing matters. |
👉 Open account → |
COINOTAG recommends • Exchange signup |
🧭 A focused workflow for traders |
Alerts, watchlists, and a repeatable process. |
👉 Get started → |
COINOTAG recommends • Exchange signup |
✅ Data‑driven decisions |
Focus on process—not noise. |
👉 Sign up → |
The New York PSC approved a 345-kilovolt underground power line to supply Micron’s Onondaga $100 billion megafab, enabling the two-mile connection and expanded Clay substation to support an estimated 50,000 jobs and 9,000 direct Micron roles.
Published: October 17, 2025 — Updated: October 17, 2025 — Author: COINOTAG
-
345-kilovolt, two-mile underground line approved to power Micron’s Onondaga megafab.
-
Project includes Clay substation expansion and new equipment for initial construction phase.
-
Micron’s facility is tied to a $100 billion investment and projected to create more than 50,000 jobs over two decades.
Micron Onondaga power line approval: PSC greenlights 345-kV underground link for Micron’s $100B megafab—read the latest details and expected economic impact. Learn more.
COINOTAG recommends • Professional traders group |
💎 Join a professional trading community |
Work with senior traders, research‑backed setups, and risk‑first frameworks. |
👉 Join the group → |
COINOTAG recommends • Professional traders group |
📊 Transparent performance, real process |
Spot strategies with documented months of triple‑digit runs during strong trends; futures plans use defined R:R and sizing. |
👉 Get access → |
COINOTAG recommends • Professional traders group |
🧭 Research → Plan → Execute |
Daily levels, watchlists, and post‑trade reviews to build consistency. |
👉 Join now → |
COINOTAG recommends • Professional traders group |
🛡️ Risk comes first |
Sizing methods, invalidation rules, and R‑multiples baked into every plan. |
👉 Start today → |
COINOTAG recommends • Professional traders group |
🧠 Learn the “why” behind each trade |
Live breakdowns, playbooks, and framework‑first education. |
👉 Join the group → |
COINOTAG recommends • Professional traders group |
🚀 Insider • APEX • INNER CIRCLE |
Choose the depth you need—tools, coaching, and member rooms. |
👉 Explore tiers → |
What is the Micron Onondaga power line approval?
The Micron Onondaga power line approval is the New York Public Service Commission’s authorization to build a 345-kilovolt underground transmission line connecting the Clay substation to Micron Technology’s planned $100 billion semiconductor megafab in Onondaga County. The decision clears environmental and construction plans for the project’s first phase.
How will the 345-kilovolt line support Micron’s $100 billion megafab?
The two-mile, 345-kV underground line is designed to supply the large, continuous electricity demand of advanced semiconductor fabrication. The approval includes expanding the Clay substation and installing new switchgear and transmission equipment. According to Reuters and statements from Governor Kathy Hochul, the infrastructure is intended to provide reliable power for thousands of high-demand manufacturing processes and cleanroom operations that are typical in modern fabs.
COINOTAG recommends • Exchange signup |
📈 Clear interface, precise orders |
Sharp entries & exits with actionable alerts. |
👉 Create free account → |
COINOTAG recommends • Exchange signup |
🧠 Smarter tools. Better decisions. |
Depth analytics and risk features in one view. |
👉 Sign up → |
COINOTAG recommends • Exchange signup |
🎯 Take control of entries & exits |
Set alerts, define stops, execute consistently. |
👉 Open account → |
COINOTAG recommends • Exchange signup |
🛠️ From idea to execution |
Turn setups into plans with practical order types. |
👉 Join now → |
COINOTAG recommends • Exchange signup |
📋 Trade your plan |
Watchlists and routing that support focus. |
👉 Get started → |
COINOTAG recommends • Exchange signup |
📊 Precision without the noise |
Data‑first workflows for active traders. |
👉 Sign up → |
Official figures tied to the project indicate it supports a facility projected to generate more than 50,000 jobs over 20 years, with about 9,000 direct roles within Micron. The PSC review covered both environmental permits and construction sequencing to minimize local disruption during the initial phase.
Frequently Asked Questions
When was the PSC approval announced and who announced it?
The approval was announced on October 17, 2025 by Governor Kathy Hochul, with details reported by Reuters. The PSC approved the transmission link and associated substation upgrades as part of the state’s support for the Micron investment.
COINOTAG recommends • Traders club |
⚡ Futures with discipline |
Defined R:R, pre‑set invalidation, execution checklists. |
👉 Join the club → |
COINOTAG recommends • Traders club |
🎯 Spot strategies that compound |
Momentum & accumulation frameworks managed with clear risk. |
👉 Get access → |
COINOTAG recommends • Traders club |
🏛️ APEX tier for serious traders |
Deep dives, analyst Q&A, and accountability sprints. |
👉 Explore APEX → |
COINOTAG recommends • Traders club |
📈 Real‑time market structure |
Key levels, liquidity zones, and actionable context. |
👉 Join now → |
COINOTAG recommends • Traders club |
🔔 Smart alerts, not noise |
Context‑rich notifications tied to plans and risk—never hype. |
👉 Get access → |
COINOTAG recommends • Traders club |
🤝 Peer review & coaching |
Hands‑on feedback that sharpens execution and risk control. |
👉 Join the club → |
Will this affect Micron’s operations in China or its global market position?
Micron is simultaneously reshaping its global supply decisions: the company halted shipments of certain data center chips into mainland China after restrictions in 2023, while maintaining other business lines there. Micron continues local packaging investments in Xi’an and sells to select Chinese customers via data centers outside mainland China. These operational moves reflect trade and regulatory factors rather than the Onondaga project itself.
Key Takeaways
- Regulatory green light: New York PSC approved the 345-kV underground line and first-phase construction plans, enabling the Clay substation expansion.
- Economic scale: The megafab ties to a projected $100 billion investment and more than 50,000 jobs over two decades, including ~9,000 Micron positions.
- Strategic context: The approval advances U.S. semiconductor capacity goals while Micron adjusts its China market footprint amid trade restrictions and local competition.
Micron, local leaders and expert comments
Governor Kathy Hochul described the approval as a transformational step for Central New York and said the state is “moving quickly ahead with all due speed and deliberation.” Micron issued a company statement noting the data center division “had been impacted by the ban” in mainland China and reiterated compliance with local regulations where it operates. Independent industry observers cite broader U.S. efforts to rebuild domestic chip manufacturing capacity as the policy backdrop.
Additional context and data
Background reporting by Reuters and public statements around this project place it within a 2022 agreement that selected Onondaga County as the site for Micron’s advanced chip factory. The plant aligns with national targets to increase domestic semiconductor production, including a stated goal to produce roughly one in four U.S.-made semiconductors by 2030. Separately, Reuters reported that China’s AI data center market surged to 24.7 billion yuan (about $3.4 billion) in 2024, which benefited regional competitors.
Conclusion
The New York PSC’s approval of the 345-kilovolt underground line is a critical infrastructure milestone that enables Micron’s planned $100 billion Onondaga megafab while reinforcing state and national semiconductor strategies. With clear regulatory sign-off, projected job creation, and careful environmental planning, the project advances both local economic development and broader efforts to secure domestic chip-making capacity. For continuing coverage and updates, follow COINOTAG reporting and official PSC announcements.
COINOTAG recommends • Exchange signup |
📈 Clear control for futures |
Sizing, stops, and scenario planning tools. |
👉 Open futures account → |
COINOTAG recommends • Exchange signup |
🧩 Structure your futures trades |
Define entries & exits with advanced orders. |
👉 Sign up → |
COINOTAG recommends • Exchange signup |
🛡️ Control volatility |
Automate alerts and manage positions with discipline. |
👉 Get started → |
COINOTAG recommends • Exchange signup |
⚙️ Execution you can rely on |
Fast routing and meaningful depth insights. |
👉 Create account → |
COINOTAG recommends • Exchange signup |
📒 Plan. Execute. Review. |
Frameworks for consistent decision‑making. |
👉 Join now → |
COINOTAG recommends • Exchange signup |
🧩 Choose clarity over complexity |
Actionable, pro‑grade tools—no fluff. |
👉 Open account → |
COINOTAG recommends • Members‑only research |
📌 Curated setups, clearly explained |
Entry, invalidation, targets, and R:R defined before execution. |
👉 Get access → |
COINOTAG recommends • Members‑only research |
🧠 Data‑led decision making |
Technical + flow + context synthesized into actionable plans. |
👉 Join now → |
COINOTAG recommends • Members‑only research |
🧱 Consistency over hype |
Repeatable rules, realistic expectations, and a calmer mindset. |
👉 Get access → |
COINOTAG recommends • Members‑only research |
🕒 Patience is an edge |
Wait for confirmation and manage risk with checklists. |
👉 Join now → |
COINOTAG recommends • Members‑only research |
💼 Professional mentorship |
Guidance from seasoned traders and structured feedback loops. |
👉 Get access → |
COINOTAG recommends • Members‑only research |
🧮 Track • Review • Improve |
Documented PnL tracking and post‑mortems to accelerate learning. |
👉 Join now → |